top of page
Before
Before
During Construction
Before
1/4
Silicon Valley Demo, San Jose, California
At Silicon Valley Demo, the scope of work was to put in new finishes, new break room and non structural wall. This new break room made a difference for the space in that it made the place feel less empty and vast. A non structural wall was added towards the front of the space to create more privacy and a better sense of space for the lobby.
bottom of page